Phase 2 at Nolans — The Most Undervalued Optionality in Rare Earths​

When investors discuss Arafura Rare Earths, the conversation almost always centres on financing milestones, offtake agreements, or Phase 1 production volumes. What receives far less attention, yet will ultimately drive the most strategic value — is the embedded expansion optionality at the Nolans project.

Background - Phase 1​

Phase 1 production (~4,400 tpa NdPr oxide) positions Nolans as a meaningful ex-China supplier. But from a strategic supply-chain perspective, that volume alone doesn’t fundamentally shift global dynamics.

Phase 2 (at around 11,000 tpa NdPr Oxide), however:
  • Potentially massively increases oxide output.
  • Leverages already-permitted infrastructure and process design.
  • Benefits from operational learning curves and debottlenecking.
This dramatically lowers incremental capital intensity compared with a greenfield competitor.

Phase 2 is expansion, not reinvention.

Separation Capacity Is the Real Scarcity​

A persistent misunderstanding in rare earth markets is that ore availability is the main constraint. It isn’t.

The bottleneck is:
  • solvent extraction scale,
  • chemical plant reliability,
  • and consistent oxide specification.
Nolans was engineered from the outset as a mine-to-oxide operation, not a concentrate export play. That distinction matters:
  • Expansion of an operating separation plant is far easier than building one from scratch.
  • Customers value oxide certainty far more than upstream concentrate supply.
Phase 2 therefore carries disproportionate strategic weight relative to its headline tonnage.

Also - the nolans deposit is 'open at depth'. This means that there could be much more scale to the deposit. During Phase 1, some additonal drilling will take place to determine the full extent of the deposit.

Why OEMs and Governments Care​

Western automakers, defence agencies, and magnet manufacturers increasingly prioritise:
  • jurisdictional stability,
  • ESG traceability,
  • long-term contract reliability.
Additional NdPr oxide from Australia checks all three boxes.

If Phase 2 proceeds:
  • it strengthens non-China pricing benchmarks,
  • improves supply diversification narratives,
  • and reduces reliance on opaque Asian supply chains.
That geopolitical leverage is often underpriced in equity valuations.

The Economic Flywheel Effect​

Once Phase 1 is operational:
  • financing risk drops materially,
  • technical performance becomes demonstrable rather than theoretical,
  • customer confidence increases.
That combination historically unlocks cheaper capital for expansion in resource projects. The result is a capital-efficiency flywheel that early investors often overlook.

In additon, if Phase 1 can be commisioned, with little use of the contingencies, these monies could materially cover the additional capex for Phase 2 meaning if there was a need for any capital raise, it would be modest.

Also, we are not 100% clear what the US Govt's US$300 million is for? Presumably Phase 2? (it could be HREE related too?)

Why the Market May Be Underpricing ARU and Phase 2​

Three reasons stand out:
  1. Short-term financing focus — markets prioritise getting to FID and then construction risk over the Phase 2 expansion upside.
  2. Rare earth technical complexity — few analysts model solvent-extraction scale realistically.
  3. China dominance narrative — it suppresses appreciation of credible ex-China growth.
Yet structurally, large integrated oxide projects outside China remain rare — and difficult to replicate quickly.

Bottom Line​

Phase 1 establishes credibility.
Phase 2 potentially reshapes relevance.

For those analysing future NdPr supply balance — particularly in magnet, EV, robotics, and defence sectors — the expansion pathway at Nolans is arguably one of the most consequential medium-term variables in the ex-China rare earth landscape.

And right now, it still appears materially under-reflected in market perception.




Let me know if you have any questions about Phase 2 (or anything else).
 

Phase 2 at Nolans — The Most Undervalued Optionality in Rare Earths​

When investors discuss Arafura Rare Earths, the conversation almost always centres on financing milestones, offtake agreements, or Phase 1 production volumes. What receives far less attention, yet will ultimately drive the most strategic value — is the embedded expansion optionality at the Nolans project.

Background - Phase 1​

Phase 1 production (~4,400 tpa NdPr oxide) positions Nolans as a meaningful ex-China supplier. But from a strategic supply-chain perspective, that volume alone doesn’t fundamentally shift global dynamics.

Phase 2 (at around 11,000 tpa NdPr Oxide), however:
  • Potentially massively increases oxide output.
  • Leverages already-permitted infrastructure and process design.
  • Benefits from operational learning curves and debottlenecking.
This dramatically lowers incremental capital intensity compared with a greenfield competitor.

Phase 2 is expansion, not reinvention.

Separation Capacity Is the Real Scarcity​

A persistent misunderstanding in rare earth markets is that ore availability is the main constraint. It isn’t.

The bottleneck is:
  • solvent extraction scale,
  • chemical plant reliability,
  • and consistent oxide specification.
Nolans was engineered from the outset as a mine-to-oxide operation, not a concentrate export play. That distinction matters:
  • Expansion of an operating separation plant is far easier than building one from scratch.
  • Customers value oxide certainty far more than upstream concentrate supply.
Phase 2 therefore carries disproportionate strategic weight relative to its headline tonnage.

Also - the nolans deposit is 'open at depth'. This means that there could be much more scale to the deposit. During Phase 1, some additonal drilling will take place to determine the full extent of the deposit.

Why OEMs and Governments Care​

Western automakers, defence agencies, and magnet manufacturers increasingly prioritise:
  • jurisdictional stability,
  • ESG traceability,
  • long-term contract reliability.
Additional NdPr oxide from Australia checks all three boxes.

If Phase 2 proceeds:
  • it strengthens non-China pricing benchmarks,
  • improves supply diversification narratives,
  • and reduces reliance on opaque Asian supply chains.
That geopolitical leverage is often underpriced in equity valuations.

The Economic Flywheel Effect​

Once Phase 1 is operational:
  • financing risk drops materially,
  • technical performance becomes demonstrable rather than theoretical,
  • customer confidence increases.
That combination historically unlocks cheaper capital for expansion in resource projects. The result is a capital-efficiency flywheel that early investors often overlook.

In additon, if Phase 1 can be commisioned, with little use of the contingencies, these monies could materially cover the additional capex for Phase 2 meaning if there was a need for any capital raise, it would be modest.

Also, we are not 100% clear what the US Govt's US$300 million is for? Presumably Phase 2? (it could be HREE related too?)

Why the Market May Be Underpricing ARU and Phase 2​

Three reasons stand out:
  1. Short-term financing focus — markets prioritise getting to FID and then construction risk over the Phase 2 expansion upside.
  2. Rare earth technical complexity — few analysts model solvent-extraction scale realistically.
  3. China dominance narrative — it suppresses appreciation of credible ex-China growth.
Yet structurally, large integrated oxide projects outside China remain rare — and difficult to replicate quickly.

Bottom Line​

Phase 1 establishes credibility.
Phase 2 potentially reshapes relevance.

For those analysing future NdPr supply balance — particularly in magnet, EV, robotics, and defence sectors — the expansion pathway at Nolans is arguably one of the most consequential medium-term variables in the ex-China rare earth landscape.

And right now, it still appears materially under-reflected in market perception.




Let me know if you have any questions about Phase 2 (or anything else).

If all the above comes to fruition, a 10 year hold could provide generational wealth.
 
If all the above comes to fruition, a 10 year hold could provide generational wealth.
I don't think you need to hold 10 years. The market is always forward looking. So once FID is achieved and construciton is well underway, and some more details are shared on Phase 2 (capex, US money etc.) it should start to be factored into the SP.

I think if they are going to do Phase 2....and all that construction....why not do some acquisitions as well....and build that in (or do some tolling of product). And build it all at once.
 
I like it but i would be glad with FID

It is going to be very interesting to see what happens at FID. Because many retail will try to sell then.

Sellers:
- Short term traders
- Long term retail investors who have been waiting years for FID

Buyers:
- Funds/Family offices that can only buy mines that a financed
- Long term investors

I would say that the total amount the buyers will be larger than the sellers.

BUT - These Funds/Family offices won't just snap up shares, they will slowly accumulate over 6-12 months. Whereas, retail will likley just dump their shares on the FID annoucement.

So if you are a retail investor....maybe it is worth just holding on a little longer....

Of course....maybe FOMO will just rule the day....and prices will move sharply up?

What do others think?
 
Back
Top